Haydock STOR Project

Client: Finning UK
Location: Manchester, UK
System Capacity: 8 MWp
Technology: Gas Reciprocating Engines

N-ERGY has provided project management and site management for designing and building capacity market power plant. The power plant is placed inside an existing building in Manchester with 8 MW capacity of gas reciprocating engines. The power plant is expected to supply the grid with energy for a duration of 900 hours every year. 

N-ERGY helped install gas engines inside the building and delivered mechanical and gas pipework.  The project was build and delivered in seven months and N-ERGY provided value engineering to reduce cost.